46 CFR 62.20-1
§ 62.20-1 Plans for approval.
United States · 46 CFR — Shipping · Status: effective
Cite this
- Citation
- 46 CFR 62.20-1, § 62.20-1 Plans for approval, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/225358
- Permanent ID
ys:prov:225358@1- SHA-256
1ef8fff0c20a012dd6aac9f5a037c03e1b7c80ac0eed186e431243a7fefecc49
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) The following plans must be submitted to the Coast Guard for approval in accordance with §§ 50.20-5 and 50.20-10 of this chapter:
(1) A general arrangement plan of control and monitoring equipment, control locations, and the systems served.
(2) Control and monitoring console, panel, and enclosure layouts.
(3) Schematic or logic diagrams including functional relationships, a written description of operation, and sequences of events for all modes of operation.
(4) A description of control or monitoring system connections to non-vital systems.
(5) A description of programmable features.
(6) A description of built-in test features and diagnostics.
(7) Design Verification and Periodic Safety test procedures described in subpart 61.40 of this subchapter.
(8) Control system normal and emergency operating instructions.
(b) [Reserved]
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.