yourstate.us
46 CFR 63.25-7

§ 63.25-7 Exhaust gas boilers.

United States · 46 CFR — Shipping · Status: effective

Get this as JSONEmbed this
Cite this
Citation
46 CFR 63.25-7, § 63.25-7 Exhaust gas boilers, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/225406
Permanent ID
ys:prov:225406@1
SHA-256
4d42ec5438447a554e8e18cfee39e003d0d9261b15c65e65cc58734e9a1425f4

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) Construction. An auxiliary exhaust gas boiler must meet the applicable construction requirements of part 52 or part 53 of this subchapter as determined from table 1 to § 54.01-5 of this subchapter. (b) Controls. Each drum type exhaust gas steam boiler must have a feed water control system. The system must automatically supply the required amount of feed water and maintain it at the proper level. For boilers without a fixed water level, the control system must supply the feed water at a rate sufficient to ensure proper heat transfer. The system must adequately fill the boiler when cold. (c) Alarms. When a condition arises which results in inadequate heat transfer, a high temperature alarm or low flow alarm must be activated. An audible alarm must automatically sound, and a visual indicator must indicate when the fluid temperature exceeds the maximum operating temperature or when the fluid/steam flowing through the heat exchanger is insufficient to ensure proper heat transfer. Additionally, an audible alarm must automatically sound, and a visual indicator must indicate when a soot fire is present in the exhaust gas boiler's uptake.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.