yourstate.us
46 CFR 111.10-9

§ 111.10-9 Ship's service supply transformers; two required.

United States · 46 CFR — Shipping · Status: effective

Get this as JSONEmbed this
Cite this
Citation
46 CFR 111.10-9, § 111.10-9 Ship's service supply transformers; two required, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/227019
Permanent ID
ys:prov:227019@1
SHA-256
d4fd8850b67fa99ac9af7b8973f2f990b0b4c3569f176e4e3862dbb19064b61b

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

If transformers are used to supply the ship's service distribution system required by this subpart for ships and mobile offshore drilling units, there must be at least two installed, independent power transformers. With the largest transformer out of service, the capacity of the remaining units must be sufficient to supply the ship service loads. A ship's service supply system would consist of transformers, overcurrent protection devices, and cables, and would normally be located in the system between a medium voltage bus and a low voltage ship's service switchboard. It is not the intent, nor is it required, that transformers fed by the ship's service switchboard, such as 480/120 transformers, be duplicated.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.