§ 112.15-10 Loads on systems without a temporary emergency power source.

United States · 46 CFR — Shipping · Status: effective

Get this as JSONEmbed this
Cite this
Citation
46 CFR 112.15-10, § 112.15-10 Loads on systems without a temporary emergency power source, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/227230
Permanent ID
ys:prov:227230@1
SHA-256
fc62e9eb2f9d07d8e9846874715bddd8ed3484fe3c61aa03dc20ac8c5a986062

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

If there is no temporary emergency power source, the loads under § 112.15-1 must be arranged so that they can be energized from the final emergency power source.