yourstate.us
46 CFR 112.20-5

§ 112.20-5 Failure of power from the normal source or final emergency power source.

United States · 46 CFR — Shipping · Status: effective

Get this as JSONEmbed this
Cite this
Citation
46 CFR 112.20-5, § 112.20-5 Failure of power from the normal source or final emergency power source, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/227234
Permanent ID
ys:prov:227234@1
SHA-256
b16d2759e436f784e4be86e4bb1800d7019df34488d6556aa6a3bda4e817a454

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) If there is a reduction of potential of the normal source by 15 to 40 percent, the loads under § 112.15-1 must be automatically supplied from the temporary emergency power source. (b) For systems in which a reduction of frequency of the normal source or final emergency power source adversely affects the emergency system and emergency loads, there must be means to transfer the loads under § 112.15-1 to the temporary emergency power source upon a reduction in the frequency of the normal source or final emergency power source.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.