yourstate.us
46 CFR 136.202

§ 136.202 Certificate of Inspection phase-in period.

United States · 46 CFR — Shipping · Status: effective

Get this as JSONEmbed this
Cite this
Citation
46 CFR 136.202, § 136.202 Certificate of Inspection phase-in period, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/228050
Permanent ID
ys:prov:228050@1
SHA-256
f918b8e34f503e4737e8830618d2f63c04635ea2597b79c84088444d09e8c823

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) All owners or managing operators of more than one existing towing vessel required to have a COI by this subchapter must ensure that each existing towing vessel under their ownership or control is issued a valid COI according to the following schedule: (1) By July 22, 2019, at least 25 percent of the towing vessels must have valid COIs on board; (2) By July 20, 2020, at least 50 percent of the towing vessels must have valid COIs on board; (3) By July 19, 2021, at least 75 percent of the towing vessels must have valid COIs on board; and (4) By July 19, 2022, 100 percent of the towing vessels must have valid COIs on board. (b) All owners or managing operators of only one existing towing vessel required to have a COI by this subchapter must ensure the vessel has an onboard, valid COI by July 20, 2020. (c) A new towing vessel must obtain a COI before it enters into service.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.