46 CFR 148.90
§ 148.90 Preparations before loading.
United States · 46 CFR — Shipping · Status: effective
Cite this
- Citation
- 46 CFR 148.90, § 148.90 Preparations before loading, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/228401
- Permanent ID
ys:prov:228401@1- SHA-256
30e758317369ed3e54fecff8a15bf1a6105844c876ab9e801a13742f43162718
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
Before loading any material listed in Table 148.10 of this part, in bulk on board a vessel, the following conditions must be met:
(a) If a hold previously has contained any material required under Subpart D of this part to be segregated from the material to be loaded, the hold must be thoroughly cleaned of all residue of the previous cargoes.
(b) If the material to be loaded is Class 4.1, 4.2, or 5.1, then all combustible materials must be removed from the hold. Examples of some combustible materials are residue of previous cargoes, loose debris, and dunnage. Permanent wooden battens or sheathing may remain in the hold unless forbidden by Subpart E of this part.
(c) If the material to be loaded is classified as Class 4.3, or is subject to liquefaction, the hold and associated bilge must be as dry as practicable.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.