46 CFR 154.650
§ 154.650 Cargo tank and process pressure vessel welding.
United States · 46 CFR — Shipping · Status: effective
Cite this
- Citation
- 46 CFR 154.650, § 154.650 Cargo tank and process pressure vessel welding, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/228949
- Permanent ID
ys:prov:228949@1- SHA-256
46aef5066b02af849e0decafb5bb1c95f23e2ad7616817f62bc0ef74b16453c1
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) Cargo tank and process pressure vessel welding must meet Subpart 54.05 and Part 57 of this chapter.
(b) Welding consumables used in welding cargo tanks must meet § 57.02-4 of this chapter.
(c) Independent tanks must meet the following:
(1) Each welded joint of the shells must be a full penetration butt weld, except dome to shell connections may have full penetration tee welds.
(2) Each nozzle weld must be of the full penetration type, except for small penetrations on domes.
(d) Each welded joint in an independent tank type C or in a process pressure vessel must meet part 54 of this chapter, except that any backing rings must be removed unless specially approved by the Commandant (CG-OES).
(e) Each welded joint in a membrane tank must meet the quality assurance measures, weld procedure qualification, design details, materials, construction, inspection, and production testing of components developed during the prototype testing program that are specially approved by the Commandant (CG-OES) under this part.
(f) Each welded joint in a semi-membrane tank must meet paragraph (c) or (e) of this section.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.