46 CFR 159.005-9
§ 159.005-9 Approval inspections and tests.
United States · 46 CFR — Shipping · Status: effective
Cite this
- Citation
- 46 CFR 159.005-9, § 159.005-9 Approval inspections and tests, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/229101
- Permanent ID
ys:prov:229101@1- SHA-256
b2f008e1f998d15123e3a4256de3093218bd30adb14503e595d38522af55d1bf
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) Each manufacturer of equipment or material that is required to be subjected to approval inspections and tests must—
(1) If the applicable subpart requires the equipment or material to be inspected or tested, have the approval inspections or tests performed;
(2) If the applicable subpart requires the equipment or material to be inspected or tested by an independent laboratory, insure that a laboratory accepted by the Commandant performs or supervises the approval inspections or tests;
(3) Bear all costs of the approval inspections and tests;
(4) If requested, advise the Commandant of the time, date, and place of each approval inspection or test, or both, before the inspection or test is performed; and
(5) After completion of the approval inspections and tests, submit to the Commandant—
(i) A test report that meets § 159.005-11;
(ii) At least two sets of specifications of the material as inspected or tested or at least two sets of plans of the equipment as inspected or tested that meet § 159.005-12; and
(iii) A description of the quality control procedures that will be in effect during the production of the equipment or material.
(b) [Reserved]
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.