yourstate.us
46 CFR 160.024-3

§ 160.024-3 Materials, workmanship, construction, and performance requirements.

United States · 46 CFR — Shipping · Status: effective

Get this as JSONEmbed this
Cite this
Citation
46 CFR 160.024-3, § 160.024-3 Materials, workmanship, construction, and performance requirements, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/229179
Permanent ID
ys:prov:229179@1
SHA-256
0bdd3142fd088a6ccc4fb71cbcf2fb5c5a5837615783a25bcffb015657db22ae

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) Materials. The materials used in pistol-projected parachute red flare distress signals shall conform strictly to the specifications and drawings submitted by the manufacturer and approved by the Commandant. In general, all metallic parts shall be corrosion-resistant or properly protected against corrosion. (b) Workmanship. Pistol-projected parachute red flare distress signals shall be of first class workmanship and shall be free from imperfections of manufacture affecting their appearance or that may affect their serviceability. (c) Construction. The exterior case of the cartridge shall be made of suitable metal and shall protect against the entrance of moisture. The projectile case and delay element shall be so constructed as to prevent any possibility of the propelling charge blowing by and causing premature ejection of the projectile contents. The shoulder of the base of the cartridge shall be between 2.29 mm (0.090 in.) and 2.67 mm (0.015 in.) in thickness. The centered primer shall be set below the surface of the base between 0.25 mm (0.010 in.) and 0.50 mm (0.020 in.). (d) Performance. Signals shall meet all of the inspection and test requirements contained in § 160.024-4.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.