46 CFR 162.161-9

§ 162.161-9 Procedure for approval.

United States · 46 CFR — Shipping · Status: effective

Get this as JSONEmbed this
Cite this
Citation
46 CFR 162.161-9, § 162.161-9 Procedure for approval, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/229755
Permanent ID
ys:prov:229755@1
SHA-256
6882e8491b8c75d19d9e3a38e19d9fe5185e67cca5a14100ebadece560331a15

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) Preapproval review is required as detailed in 46 CFR 159.005-5 and 159.005-7. (b) Applications for approval must be submitted in accordance with 46 CFR 159.005-9 through 159.005-12 to the Commandant (CG-5214). In addition to the listed requirements: (1) Evidence must be shown that an acceptable follow-up factory inspection program is in place in each factory location. This could be demonstrated by providing an original copy of the contract for a follow-up program between the manufacturer and the independent laboratory. The follow-up program must include provisions that prohibit changes to the approved equipment without review and approval by the independent laboratory. (2) Two design, installation, operation and maintenance manuals must be submitted.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.