§ 164.019-9 Procedure for acceptance of revisions of design, process, or materials.
United States · 46 CFR — Shipping · Status: effective
Cite this
- Citation
- 46 CFR 164.019-9, § 164.019-9 Procedure for acceptance of revisions of design, process, or materials, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/229862
- Permanent ID
ys:prov:229862@1- SHA-256
18e813b3826d2c25ac9ba1217c66a4b4023ad4ae7f748ef6cfa39717dcf02fda
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) The manufacturer shall not change the design, material, manufacturing process, or construction of a non-standard component unless it has been previously approved by the Commandant, in accordance with paragraph (b) of this section.
(b) The manufacturer or the recognized laboratory that performs the acceptance testing required by the applicable subpart of this part or part 160 of this chapter shall submit requests for acceptance of revisions in design, material, manufacturing process, or construction of a non-standard component in writing and describe the revision in detail similar to the original request for acceptance.