yourstate.us
Colo. Rev. Stat. § 25-8-702

Approval for commencement of construction

Colorado · Colorado Revised Statutes Title 25 — Public Health and Environment · Status: effective

Get this as JSONEmbed this
Cite this
Citation
Colo. Rev. Stat. § 25-8-702, Approval for commencement of construction, Colorado, version 1 as recorded 2026-10-03, yourstate.us, https://yourstate.us/provision/2306095
Permanent ID
ys:prov:2306095@1
SHA-256
2579582114297f8b6be67ee87fd6eb162abf6b4ce2ccf4fd7375d7f864f0361e

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(1) No person shall commence the construction of any domestic wastewater treatment works or the enlargement of the capacity of an existing domestic wastewater treatment works, unless the site location and the design for the construction or expansion have been approved by the division. (2) In evaluating the suitability of a proposed site location for a domestic wastewater treatment works, the division shall: (a) Consider the local long-range comprehensive plan for the area as it affects water quality and any approved regional wastewater management plan for the area; (b) Determine that the plant on the proposed site will be managed to minimize the potential adverse impacts on water quality; and (c) Encourage the consolidation of wastewater treatment facilities whenever feasible. (3) Ninety days prior to commencement of construction of an interceptor line, the entity responsible for that line shall notify the planning agency and the division of such construction. This notification shall be accompanied with a certification by the agency receiving the wastewater for treatment that it has or will have the capacity to treat the projected wastewater from that interceptor line in accordance with the treatment agency's site approval and discharge permit. Within thirty days of receipt of notification, the planning agency, or the division, if a planning agency does not exist, shall certify that the proposed interceptor line has the capacity to carry the projected flow. In the event the entity responsible for an interceptor line does not have the said certification from the treatment agency and the planning agency, the entity shall be required to apply for a site location approval prior to commencement of construction. (4) The decision of the division concerning approval of the site location or design may be appealed to the commission. The commission shall hold a hearing on the site location or design in accordance with the provisions of section 24-4-105, C.R.S., and the decision of the commission shall be final administrative action for the purposes of section 24-4-106, C.R.S.