Colo. Rev. Stat. § 32-11-214

Authorization of facilities

Colorado · Colorado Revised Statutes Title 32 — Special Districts · Status: effective

Get this as JSONEmbed this
Cite this
Citation
Colo. Rev. Stat. § 32-11-214, Authorization of facilities, Colorado, version 1 as recorded 2026-10-03, yourstate.us, https://yourstate.us/provision/2312801
Permanent ID
ys:prov:2312801@1
SHA-256
50e41f68767e6869a1bead61169b44d584eb999c4e6b6ae453c00fab4e079c42

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(1) The district, acting by and through the board, may acquire, improve, equip, relocate, maintain, and operate the facilities, any project, or any part thereof for the benefit of the district and the inhabitants thereof, after the board has made such preliminary studies and otherwise taken such action as it determines to be necessary or desirable as preliminaries thereto. (2) When a comprehensive program for the acquisition of facilities for the district satisfactory to the board is available, such program shall be tentatively adopted. The program need only describe the proposed facilities in general terms and not in detail. (3) A public hearing on the proposed program shall be scheduled, and notice of the hearing shall be given by publication. After the hearing and any adjournments thereof which may be ordered, the board may either require changes to be made in the program as the board considers desirable, or the board may approve the program as prepared. (4) If any substantial changes to the comprehensive program are ordered at any time, in the original acquisition of the facilities or in any improvement thereto, or otherwise, a further hearing shall be held pursuant to notice which shall be given by publication. (5) Such a comprehensive program may consist of one project or of more than one project. A public hearing need not be held on each such project if it implements such a comprehensive program on which a public hearing has been held.