Utah Code § 10-2a-505
Modified feasibility request -- Supplemental feasibility study
Utah · Utah Code Title 10 — Utah Municipal Code · Status: effective
Cite this
- Citation
- Utah Code § 10-2a-505, Modified feasibility request -- Supplemental feasibility study, Utah, version 1 as recorded 2026-10-03, yourstate.us, https://yourstate.us/provision/2325147
- Permanent ID
ys:prov:2325147@1- SHA-256
d4448e5f3158e3610806c3e6ee512525ba9d4e7e06b39c572d608b9274da1563
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(1)
(a) The sponsors of a feasibility request may modify the request to alter the boundaries of the proposed preliminary municipality area and refile the modified feasibility request with the lieutenant governor if:
(i) the results of the feasibility study do not comply with Subsection 10-2a-504(5)(a); or
(ii)
(A) the feasibility request complies with Subsection 10-2a-502(3)(a);
(B) the annexation petition described in Subsection 10-2a-502(3)(a) that proposed the annexation of an area that is part of the proposed preliminary municipality area has been denied; and
(C) a petition for incorporation described in Section 10-2a-507, based on the feasibility request, has not been filed.
(b)
(i) The sponsors of a feasibility request may not file a modified request under Subsection (1)(a)(i) more than 90 days after the day on which the feasibility consultant submits the final results of the feasibility study under Subsection 10-2a-504(2)(c)(iii).
(ii) The sponsors of a feasibility request may not file a modified request under Subsection (1)(a)(ii) more than 18 months after filing the original feasibility request under Section 10-2a-502.
(c) A modified feasibility request under Subsection (1)(a) shall comply with Subsections 10-2a-502(1) through (4).
(d) Within 20 days after the day on which the lieutenant governor receives the modified request, the lieutenant governor shall follow the same procedure described in Subsections 10-2a-503(1) through (4) for the modified feasibility request as for an original feasibility request.
(2) The timely filing of a modified feasibility request under Subsection (1) gives the modified feasibility request the same processing priority under Subsection 10-2a-503(6) as the original feasibility request.
(3) The sponsors of a feasibility request may not file a modified feasibility request under Subsection (1)(a)(i) more than once.
(4) Within 10 days after the day on which the county clerk receives a modified feasibility request under Subsection (1)(a) that relates to a request for which a feasibility study has already been completed, the lieutenant governor shall commission the feasibility consultant who conducted the feasibility study to conduct a supplemental feasibility study that accounts for the modified feasibility request.
(5) The lieutenant governor shall require the feasibility consultant to:
(a) submit a draft of the supplemental feasibility study to each applicable person with whom the feasibility consultant is required to consult under Subsection 10-2a-504(3)(c) within 30 days after the day on which the feasibility consultant is engaged to conduct the supplemental study;
(b) allow each person to whom the consultant provided a draft under Subsection (5)(a) to review and provide comment on the draft; and
(c) submit a completed supplemental feasibility study, to the following within 45 days after the day on which the feasibility consultant is engaged to conduct the feasibility study:
(i) the lieutenant governor;
(ii) the county legislative body of the county in which the incorporation is proposed;
(iii) the primary sponsor contact; and
(iv) each person to whom the consultant provided a draft under Subsection (5)(a).
(6)
(a) Subject to Subsections (3) and (6)(b), if the results of the supplemental feasibility study do not comply with Subsection 10-2a-504(4), the sponsors may further modify the request in accordance with Subsection (1).
(b) Subsections (1)(d), (4), and (5) apply to a modified feasibility request described in Subsection (6)(a).
(c) The lieutenant governor shall consider a modified feasibility request described in Subsection (6)(a) as an original feasibility request for purposes of determining the modified feasibility request's processing priority under Subsection 10-2a-503(6).