yourstate.us
Utah Code § 11-13-304

Certificate of public convenience and necessity required -- Exceptions

Utah · Utah Code Title 11 — Cities, Counties, and Local Taxing Units · Status: effective

Get this as JSONEmbed this
Cite this
Citation
Utah Code § 11-13-304, Certificate of public convenience and necessity required -- Exceptions, Utah, version 1 as recorded 2026-10-03, yourstate.us, https://yourstate.us/provision/2325835
Permanent ID
ys:prov:2325835@1
SHA-256
2056a670cfa020aa4a1b507fd1cb396ad46871dabf7d9cea1425f390a8af6811

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(1) Before proceeding with the construction of any electrical generating plant or transmission line, each interlocal entity and each out-of-state public agency shall first obtain from the public service commission a certificate, after hearing, that public convenience and necessity requires such construction and in addition that such construction will in no way impair the public convenience and necessity of electrical consumers of the state of Utah at the present time or in the future. (2) The requirement to obtain a certificate of public convenience and necessity applies to each project initiated after the section's effective date but does not apply to: (a) a project for which a feasibility study was initiated prior to the effective date; (b) any facilities providing additional project capacity; (c) any facilities providing replacement project capacity; or (d) transmission lines required for the delivery of electricity from a project described in Subsection (2)(a), or facilities providing additional project capacity, or facilities providing replacement project capacity within the corridor of a transmission line, with reasonable deviation, of a project producing as of April 21, 1987.