Utah Code § 17-78-303
Distribution of waters -- Operation of projects
Utah · Utah Code Title 17 — Counties · Status: effective
Cite this
- Citation
- Utah Code § 17-78-303, Distribution of waters -- Operation of projects, Utah, version 1 as recorded 2026-10-03, yourstate.us, https://yourstate.us/provision/2329295
- Permanent ID
ys:prov:2329295@1- SHA-256
f632ab14f55a91ada442ff597ce524c1b67c1b5563059ea1d2246a507899ab25
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
The duty of distributing the waters of and operating the flood control project when completed shall rest upon the state engineer described in Section 73-2-1, provided, that the cost of such distribution and operation of the project by the state engineer shall be borne by the county entering into the cooperative contract with the United States of America for the construction and the operation of the flood control project.