yourstate.us
Utah Code § 54-14-306

Action required of local government following board decision

Utah · Utah Code Title 54 — Public Utilities · Status: effective

Get this as JSONEmbed this
Cite this
Citation
Utah Code § 54-14-306, Action required of local government following board decision, Utah, version 1 as recorded 2026-10-03, yourstate.us, https://yourstate.us/provision/2341641
Permanent ID
ys:prov:2341641@1
SHA-256
7d5616692dd92eadc654dfad46b8f8f5f9746c2faa01eb54f2ce21f560410508

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(1) If the board decides that a facility permitted to be constructed by a local government is subject to requirements or conditions that impose an estimated excess cost but do not impair the provision of safe, reliable, and adequate service to customers of the public utility, the local government shall, within 20 days following the decision of the board, determine whether it will impose the requirement or conditions imposing an estimated excess cost or issue the permit, authorization, approval, exception, or waiver without the requirements or conditions imposing an estimated excess cost. (2) If the board decides that a facility should be constructed that the local government has prohibited, the local government shall, within 60 days following the decision of the board, issue the permit, authorization, approval, exception, or waiver consistent with the decision of the board. (3) The local government may impose requirements or conditions pursuant to its zoning, subdivision, or building code regulations if: (a) the requirements or conditions do not impair safe, reliable, and adequate service to the customers of the utility; and (b) the local government enters into an agreement with the public utility within the 20-day time limit specified by Subsection (1) or the 60-day time limit specified by Subsection (2) to pay for the actual excess cost to the public utility, except any actual excess costs specified in Subsection 54-14-201(2)(a) or (2)(b), at least 30 days before the date construction of the facility should commence.