W. Va. Code § 16-12-7
Collections for maintenance and operating costs of works for industrial sewage; how costs determined
West Virginia · West Virginia Code Chapter 16 — Public Health · Status: effective
Cite this
- Citation
- W. Va. Code § 16-12-7, Collections for maintenance and operating costs of works for industrial sewage; how costs determined, West Virginia, version 1 as recorded 2026-10-03, yourstate.us, https://yourstate.us/provision/2367280
- Permanent ID
ys:prov:2367280@1- SHA-256
3d133a6432e4bd1407ea17e7c0398aae3300eace529a7ddefc0c7bab2b8870e4
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
In providing works for industrial sewage, commonly called industrial wastes, in the manner above provided, whether said industrial sewage is disposed of in combination with municipal sewage or independently, said sanitary district shall have power to apportion and collect therefor, from the producer thereof, fair additional construction, maintenance and operating costs over and above those covered by normal taxes and/or service rates or charges, and in case of dispute as to the fairness of such additional construction, maintenance and operating costs, then the same shall be determined by a board of three engineers, one appointed by said sanitary district, one appointed by such producer or producers, or their legal representatives, and the third to be appointed by the two engineers as above described. In the event the two engineers so selected shall fail to agree upon a third engineer, then upon petition of either of the parties the circuit judge shall appoint such third engineer. A decision of a majority of said board shall be binding on both parties and the costs of services of said board shall be shared by both parties equally.