yourstate.us
47 CFR 78.108

§ 78.108 Minimum path lengths for fixed links.

United States · 47 CFR — Telecommunication · Status: effective

Get this as JSONEmbed this
Cite this
Citation
47 CFR 78.108, § 78.108 Minimum path lengths for fixed links, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/237305
Permanent ID
ys:prov:237305@1
SHA-256
8b0417c2a35b119d01620ad7f8261b35fbea53d564b51634694ef19bfac32ab4

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) The distance between end points of a fixed link must equal or exceed the value set forth in the table below or the EIRP must be reduced in accordance with the equation set forth below. (b) For paths shorter than those specified in the Table, the EIRP shall not exceed the value derived from the following equation. Where: For transmitters using Automatic Transmitter Power Control, EIRP corresponds to the maximum transmitter power available, not the coordinated transmit power or the nominal transmit power. (c) Upon an appropriate technical showing, applicants and licensees unable to meet the minimum path length requirement may be granted an exception to these requirements. Links authorized prior to April 1, 1987, are excluded from this requirement, except that, effective April 1, 1992, the Commission will require compliance with the criteria where an existing link would otherwise preclude establishment of a new link.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.