yourstate.us
47 CFR 101.63

§ 101.63 Period of construction; certification of completion of construction.

United States · 47 CFR — Telecommunication · Status: effective

Get this as JSONEmbed this
Cite this
Citation
47 CFR 101.63, § 101.63 Period of construction; certification of completion of construction, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/238642
Permanent ID
ys:prov:238642@1
SHA-256
4c685996e2e7d46802c2f6bb44b67f6c9b80aecb7cc6f2e87b280555dfe74d39

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) Each Station, except in Multichannel Video Distribution and Data Service, Local Multipoint Distribution Service, and the 24 GHz Service, authorized under this part must be in operation within 18 months from the initial date of grant. (b) For the 70 GHz, 80 GHz, and 90 GHz bands, the 12-month construction period will commence on the date of each registration of each individual link; adding links will not change the overall renewal period of the license. (c) Failure to timely begin operation means the authorization cancels automatically. (d) The frequencies associated with all point-to-multipoint authorizations which have cancelled automatically or otherwise been recovered by the Commission will again be made available for reassignment on a date and under terms set forth by Public Notice. See § 101.1331(d) for treatment of MAS incumbent site-by-site licenses recovered in EAs. (e)-(f) [Reserved] (g) MVPD licensees which have both analog and digital emissions designators specified on the license and which already have, or may transition from analog to digital operations, or a combination of both, meet their completion of construction requirements and do not automatically surrender their license provided they are using either set of emissions. If the licensee has completed the transition to digital, the license can remove the unused analog emission designators the next time a modification or renewal application is filed.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.