yourstate.us
48 CFR 4.1005-2

4.1005-2 Exceptions.

United States · 48 CFR — Federal Acquisition Regulations System · Status: effective

Get this as JSONEmbed this
Cite this
Citation
48 CFR 4.1005-2, 4.1005-2 Exceptions, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/239132
Permanent ID
ys:prov:239132@1
SHA-256
375fa6f51105e3a700504fd6fdd20e304abbf642c7fd53dd2e7dea41a2b28ba6

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) Indefinite-delivery contracts—(1) General. The following required data elements are not known at time of issuance of an indefinite-delivery contract, but shall be provided in each order at the time of issuance: accounting classification, delivery date and destination, or period and place of performance. (2) Indefinite-delivery indefinite-quantity (IDIQ) and requirements contracts. (i) IDIQ and requirements contracts may omit the quantity at the line item level for the base award provided that the total contract minimum and maximum, or the estimate, respectively, is stated. (ii) Multiple-award IDIQ contracts awarded using the procedures at 13.106-1(a)(2)(iv)(A) or 15.304(c)(1)(ii)(A) may omit price or cost at the line item or subline item level for the contract award, provided that the total contract minimum and maximum is stated (see 16.504(a)(1)). (b) Item description and PSC. These data elements are not required in the line item if there are associated deliverable subline items that include the actual detailed identification. When this exception applies, use a general narrative description for the line item. (c) Single unit price or single total price. The requirement for a single unit price or single total price at the line item level does not apply if any of the following conditions are present: (1) There are associated deliverable subline items that are priced. (2) The line item or subline item is not separately priced. (3) The supplies or services are being acquired on a cost-reimbursement, time-and-materials, or labor-hour basis. (4) The procurement instrument is for services and firm prices have been established for elements of the total price, but the actual number of the elements is not known until performance (e.g., a labor-hour contract for maintenance/repair). The contracting officer may structure these procurement instruments to reflect a firm or estimated total amount for each line item.