yourstate.us
48 CFR 7.101

7.101 Definitions.

United States · 48 CFR — Federal Acquisition Regulations System · Status: effective

Get this as JSONEmbed this
Cite this
Citation
48 CFR 7.101, 7.101 Definitions, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/239290
Permanent ID
ys:prov:239290@1
SHA-256
295d909436b3d584dc58396d9bef31cbcba6b4c16fb1959324128cf4edb20dc0

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

As used in this subpart— Acquisition streamlining, means any effort that results in more efficient and effective use of resources to design and develop, or produce quality systems. This includes ensuring that only necessary and cost-effective requirements are included, at the most appropriate time in the acquisition cycle, in solicitations and resulting contracts for the design, development, and production of new systems, or for modifications to existing systems that involve redesign of systems or subsystems. Life-cycle cost means the total cost to the Government of acquiring, operating, supporting, and (if applicable) disposing of the items being acquired. Order means an order placed under a— (1) Federal Supply Schedule contract; or (2) Task-order contract or delivery-order contract awarded by another agency, (i.e., Governmentwide acquisition contract or multi-agency contract). Planner, means the designated person or office responsible for developing and maintaining a written plan, or for the planning function in those acquisitions not requiring a written plan.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.