yourstate.us
48 CFR 22.404-9

22.404-9 Award of contract without required wage determination.

United States · 48 CFR — Federal Acquisition Regulations System · Status: effective

Get this as JSONEmbed this
Cite this
Citation
48 CFR 22.404-9, 22.404-9 Award of contract without required wage determination, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/240209
Permanent ID
ys:prov:240209@1
SHA-256
3c9c83abe351044b65b35c138e8a8860a0e806c64111fa96bda593ea15630e15

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) If a contract is awarded without the required wage determination (i.e., incorporating no determination, containing a clearly inapplicable general wage determination, or containing a project determination which is inapplicable because of an inaccurate description of the project or its location), the contracting officer shall initiate action to incorporate the required determination in the contract immediately upon discovery of the error. If a required wage determination (valid determination in effect on the date of award) is not available, the contracting officer shall expeditiously request a wage determination from the Department of Labor, including a statement explaining the crcumstances and giving the date of the contract award. (b) The contracting officer shall— (1) Modify the contract to incorporate the required wage determination (retroactive to the date of award), and equitably adjust the contract price if appropriate; or (2) Terminate the contract.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.