48 CFR 23.105
23.105 Exceptions.
United States · 48 CFR — Federal Acquisition Regulations System · Status: effective
Cite this
- Citation
- 48 CFR 23.105, 23.105 Exceptions, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/240398
- Permanent ID
ys:prov:240398@1- SHA-256
761e9a681703e55380b28cddaf439cf21c715f48ec2ffbcb9f3e94b558aecbcf
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
The following are excepted from the requirement to procure sustainable products and services:
(a) Contracts performed or supplies delivered outside of the United States, unless the agency head determines that such application is in the interest of the United States.
(b) Weapon systems; however, compliance with applicable agency affirmative procurement programs is required for recovered materials per 23.107-1 (see 23.109(b)) (42 U.S.C. 6962) and for alternatives for ozone depleting substances per 23.107-4 (see 23.109(d)) (42 U.S.C. 7671l), unless a written justification exists as described at 23.104(a) (42 U.S.C. 6962(c)(1) and 7 U.S.C. 8102(a)(1)(B)).
(c) Energy-consuming products or systems designed or procured for combat or combat-related missions are not subject to the requirements in 23.107-3 (42 U.S.C. 8259b(a)(5)).
(d) Biobased products to be used in military equipment (products or systems designed or procured for combat or combat-related missions), spacecraft systems, or launch support equipment are not subject to the requirements in 23.107-2 (7 CFR 3201.3(e)).
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.