48 CFR 25.204
25.204 Evaluating offers of foreign construction material.
United States · 48 CFR — Federal Acquisition Regulations System · Status: effective
Cite this
- Citation
- 48 CFR 25.204, 25.204 Evaluating offers of foreign construction material, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/240465
- Permanent ID
ys:prov:240465@1- SHA-256
dbb57d359378bc9cb2877e3f9ff25889512aae4ffd03777eb98b167236889f87
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) Offerors proposing to use foreign construction material other than that listed by the Government in the applicable clause at 52.225-9, paragraph (b)(2), or 52.225-11, paragraph (b)(3), or covered by the WTO GPA or a Free Trade Agreement (paragraph (b)(2) of 52.225-11), must provide the information required by paragraphs (c) and (d) of the respective clauses.
(b)(1) For construction material that is not a critical item and does not contain critical components.
(i) Unless the head of the agency specifies a higher percentage, the contracting officer shall add to the offered price 20 percent of the cost of any foreign construction material proposed for exception from the requirements of the Buy American statute based on the unreasonable cost of domestic construction materials. In the case of a tie, the contracting officer shall give preference to an offer that does not include foreign construction material excepted at the request of the offeror on the basis of unreasonable cost.
(ii) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the procedures in paragraph (b)(1)(i) of this section result in an unreasonable cost determination for the domestic construction material offer or there is no domestic construction material offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the contracting officer shall—
(A) Treat the lowest offer of foreign construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer; and
(B) Determine the reasonableness of the cost of this offer by applying the evaluation factor listed in paragraph (b)(1)(i) to the low offer.
(iii) The procedures in paragraph (b)(1)(ii) of this section will no longer apply as of January 1, 2030.
(2) For construction material that is a critical item or contains critical components.
(i) The contracting officer shall add to the offered price 20 percent, plus the additional preference factor identified for the critical item or construction material containing critical components listed at section 25.105, of the cost of any foreign construction material proposed for exception from the requirements of the Buy American statute based on the unreasonable cost of domestic construction materials. In the case of a tie, the contracting officer shall give preference to an offer that does not include foreign construction material excepted at the request of the offeror on the basis of unreasonable cost. See 25.105 for the list of critical components and critical items.
(ii) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the procedures in paragraph (b)(2)(i) of this section result in an unreasonable cost determination for the domestic construction material offer or there is no domestic construction material offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the contracting officer shall—
(A) Treat the lowest offer of foreign construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer; and
(B) Determine the reasonableness of the cost of this offer by applying the evaluation factors listed in this paragraph (b)(2) to the low offer.
(iii) The procedures in paragraph (b)(2)(ii) of this section will no longer apply as of January 1, 2030.
(c) Offerors also may submit alternate offers based on use of equivalent domestic construction material to avoid possible rejection of the entire offer if the Government determines that an exception permitting use of a particular foreign construction material does not apply.
(d) If the contracting officer awards a contract to an offeror that proposed foreign construction material not listed in the applicable clause in the solicitation (paragraph (b)(2) of 52.225-9, or paragraph (b)(3) of 52.225-11), the contracting officer must add the excepted materials to the list in the contract clause.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.