48 CFR 25.604
25.604 Preaward determination concerning the inapplicability of section 1605 of the Recovery Act or the Buy American statute.
United States · 48 CFR — Federal Acquisition Regulations System · Status: effective
Cite this
- Citation
- 48 CFR 25.604, 25.604 Preaward determination concerning the inapplicability of section 1605 of the Recovery Act or the Buy American statute, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/240507
- Permanent ID
ys:prov:240507@1- SHA-256
61c1f26b4cf0dba231742c675cbaeed09b7e4bce4930d2baa1c7258321c25fe4
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) For any acquisition, an offeror may request from the contracting officer a determination concerning the inapplicability of section 1605 of the Recovery Act or the Buy American statute for specifically identified construction materials. The time for submitting the request is specified in the solicitation in paragraph (b) of either 52.225-22 or 52.225-24, whichever applies. The information and supporting data that must be included in the request are also specified in the solicitation in paragraphs (c) and (d) of either 52.225-21 or 52.225-23, whichever applies.
(b) Before award, the contracting officer must evaluate all requests based on the information provided and may supplement this information with other readily available information.
(c) Determination based on unreasonable cost of domestic construction material.
(1) Manufactured construction material. The contracting officer must compare the offered price of the contract using foreign manufactured construction material (i.e., any construction material not manufactured in the United States, or construction material consisting predominantly of iron or steel and the iron or steel is not produced in the United States) to the estimated price if all domestic manufactured construction material were used. If use of domestic manufactured construction material would increase the overall offered price of the contract by more than 25 percent, then the contracting officer shall determine that the cost of the domestic manufactured construction material is unreasonable.
(2) Unmanufactured construction material. The contracting officer must compare the cost of each foreign unmanufactured construction material to the cost of domestic unmanufactured construction material. If the cost of the domestic unmanufactured construction material exceeds the cost of the foreign unmanufactured construction material by more than 20 percent, then the contracting officer shall determine that the cost of the domestic unmanufactured construction material is unreasonable.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.