yourstate.us
48 CFR 52.247-34

52.247-34 F.o.b. Destination.

United States · 48 CFR — Federal Acquisition Regulations System · Status: effective

Get this as JSONEmbed this
Cite this
Citation
48 CFR 52.247-34, 52.247-34 F.o.b. Destination, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/242514
Permanent ID
ys:prov:242514@1
SHA-256
3f5df4b642b9940790aedc2dc4f623123db9bfa7586dcf91fd83c668f1c42503

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

As prescribed in 47.303-6(c), insert the following clause: (a) The term f.o.b. destination, as used in this clause, means— (1) Free of expense to the Government, on board the carrier's conveyance, at a specified delivery point where the consignee's facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located; and (2) Supplies shall be delivered to the destination consignee's wharf (if destination is a port city and supplies are for export), warehouse unloading platform, or receiving dock, at the expense of the Contractor. The Government shall not be liable for any delivery, storage, demurrage, accessorial, or other charges involved before the actual delivery (or “constructive placement” as defined in carrier tariffs) or the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capacity. If rail carrier is used, supplies shall be delivered to the specified unloading platform of the consignee. If motor carrier (including “piggyback”) is used, supplies shall be delivered to truck tailgate at the unloading platform of the consignee, except when the supplies delivered meet the requirements of Item 568 of the National Motor Freight Classification for “heavy or bulky freight.” When supplies meeting the requirements of the referenced Item 568 are delivered, unloading (including movement to the tailgate) shall be performed by the consignee, with assistance from the truck driver, if requested. If the contractor uses rail carrier or freight forwarder for less than carload shipments, the contractor shall ensure that the carrier will furnish tailgate delivery, when required, if transfer to truck is required to complete delivery to consignee. (b) The Contractor shall— (1)(i) Pack and mark the shipment to comply with contract specifications; or (ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements; (2) Prepare and distribute commercial bills of lading; (3) Deliver the shipment in good order and condition to the point of delivery specified in the contract; (4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract; (5) Furnish a delivery schedule and designate the mode of delivering carrier; and (6) Pay and bear all charges to the specified point of delivery.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.