yourstate.us
48 CFR 970.1504-110

970.1504-110 Allocating the maximum total available fee amount for a one-year period to one or more of the contract's evaluation periods.

United States · 48 CFR — Federal Acquisition Regulations System · Status: effective

Get this as JSONEmbed this
Cite this
Citation
48 CFR 970.1504-110, 970.1504-110 Allocating the maximum total available fee amount for a one-year period to one or more of the contract's evaluation periods, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/248406
Permanent ID
ys:prov:248406@1
SHA-256
aeecb8964bad23d7234d5a2172c72898cd9757c9d0ac8ce13b84bde10691b008

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

Usually, the length of an evaluation period is one year, mirroring the one-year period used in calculating the maximum total available fee amount for a one-year period. The SPE's or designee's approval is required to do otherwise. Nonetheless, the Government's objective is to allocate incentives in a manner that will result in reasonable contractor risk and provide the contractor with the greatest incentive for efficient and economical performance. Consequently, there may be occasions where after calculating the maximum total available fee amount for a one-year period, part or all of it should be allocated to a subsequent one-year evaluation period, an evaluation period of greater than a year, or to several evaluation periods.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.