Or. Rev. Stat. § 285A.666
Definitions for ORS 285A.666 to 285A.732
Oregon · Oregon Revised Statutes Chapter 285A — Economic Development I · Status: effective
Cite this
- Citation
- Or. Rev. Stat. § 285A.666, Definitions for ORS 285A.666 to 285A.732, Oregon, version 1 as recorded 2026-10-04, yourstate.us, https://yourstate.us/provision/2491114
- Permanent ID
ys:prov:2491114@1- SHA-256
f675e0784e76bc11f8237eaa30be366ffeb89dbb0bb56abd4e750bccae297c73
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
As used in ORS 285A.666 to 285A.732, unless the context requires otherwise:
(1) “Flexible manufacturing space project” means a project for the acquisition, construction, improvement or rehabilitation, in whole or in part, of any building suitable for the conduct of manufacturing processes and, by design, able to be readily modified when necessary to accommodate the operations of the tenants of the building. The term includes any preproject planning activities for a flexible manufacturing space project.
(2) “Fund” means the Oregon Port Revolving Fund.
(3) “Port district” means any port formed pursuant to ORS 777.005 to 777.725 and 777.915 to 777.953 or ORS chapter 778.
(4) “Project” means a project authorized under ORS 777.105 to 777.258, including engineering, acquisition, improvement, rehabilitation, construction, operation, maintenance or preproject planning necessary to carry out the project.