48 CFR 1325.204
1325.204 Evaluating offers of foreign construction material.
United States · 48 CFR — Federal Acquisition Regulations System · Status: effective
Cite this
- Citation
- 48 CFR 1325.204, 1325.204 Evaluating offers of foreign construction material, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/249478
- Permanent ID
ys:prov:249478@1- SHA-256
8c42a8d9f8694ccf077330071bf0efd092dbba68d99e3b53d39d8b908d7dad24
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
The designee authorized to specify a percentage higher than the 6 percent that the contracting officer must add to the cost of any foreign construction material proposed for exception from the requirements of the Buy America Act is set forth in CAM 1301.70.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.