yourstate.us
48 CFR 1425.202

1425.202 Exceptions.

United States · 48 CFR — Federal Acquisition Regulations System · Status: effective

Get this as JSONEmbed this
Cite this
Citation
48 CFR 1425.202, 1425.202 Exceptions, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/250080
Permanent ID
ys:prov:250080@1
SHA-256
57a474e65d759a348ffab7a61331322640c3f78267f684777252479dfdbce13b

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a)(1) The CO may determine the reasonableness of cost as determined by the formula in 1425.203-70. (2) The Director, PAM has the authority to make the determination that use of U.S. construction material would be impracticable. Failure of the Director, PAM to issue a determination within 30 days after receipt of a request will be deemed approval for use of the cited foreign material. (3) For items not on the list at FAR 25.108(d), the CCO may make the non-availability determination if the items cost less than the SAT. The HCA may make the non-availability determination when the cost of the items exceeds the SAT. (b) [Reserved]

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.