48 CFR 3046.790-2
3046.790-2 Definitions (USCG).
United States · 48 CFR — Federal Acquisition Regulations System · Status: effective
Cite this
- Citation
- 48 CFR 3046.790-2, 3046.790-2 Definitions (USCG), United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/253200
- Permanent ID
ys:prov:253200@1- SHA-256
7297de0ea5ad9484b3af791148f78b6747aceff3a999f3bbb9e753e08f7294fc
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
As used in this part:
At no additional cost to the Government means without an increase in price for firm-fixed-price contracts, without an increase in target or ceiling price for fixed-price incentive contracts (see (FAR) 48 CFR 46.707).
Defect means any condition or characteristic in any supplies or services furnished by the contractor under the contract that is not in compliance with the requirements of the contract.
Design and manufacturing requirement means structural and engineering plans and manufacturing particulars, including precise measurements, tolerances, materials and finished product tests for the major system being produced.
Performance requirements means the operating capabilities, maintenance, and reliability characteristics of a system that are determined to be necessary for it to fulfill the requirement for which the system is designed.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.