§ 230.33 Welded repairs and alterations.

United States · 49 CFR — Transportation · Status: effective

Get this as JSONEmbed this
Cite this
Citation
49 CFR 230.33, § 230.33 Welded repairs and alterations, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/258644
Permanent ID
ys:prov:258644@1
SHA-256
03350e495dfe0ed85012bac10b0e76646f975b3dbad3deb5342f9ec42777fd4b

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) Unstayed portions of the boiler containing alloy steel or carbon steel with a carbon content over 0.25 percent. Prior to welding on unstayed portions of the boiler, the steam locomotive owner and/or operator shall submit a written request for approval to the FRA Motive Power and Equipment Division Staff Director. If the approval is granted, the steam locomotive owner and/or operator shall perform any welding to unstayed portions of the boiler in accordance with an accepted national standard for boiler repairs. The steam locomotive owner and/or operator shall satisfy reporting requirements in § 230.20 at this time. (b) Unstayed portions of the boiler containing carbon steel not exceeding 0.25 percent carbon. The steam locomotive owner and/or operator shall perform any welding to unstayed portions of the boiler in accordance with an accepted national standard for boiler repairs. The steam locomotive owner and/or operator shall satisfy reporting requirements in § 230.20 at this time. (c) Wastage. The steam locomotive owner and/or operator shall submit a written request for approval to the FRA Motive Power and Equipment Division Staff Director before performing weld build up on wasted areas of unstayed surfaces of the boiler that exceed a total of 100 square inches or the smaller of 25 percent of minimum required wall thickness or 1/2 inch. Wasted sheets shall not be repaired by weld build up if the wasted sheet has been reduced to less than 60 percent of the minimum required thickness as required by this part. (d) Flush patches. The steam locomotive owner and/or operator shall submit a written request for approval to the FRA Motive Power and Equipment Division Staff Director for the installation of flush patches of any size on unstayed portions of the boiler. (e) Stayed portions of the boiler. The steam locomotive owner and/or operator shall perform welded repairs or alterations on stayed portions of the boiler in accordance with established railroad practices, or an accepted national standard for boiler repairs. The steam locomotive owner and/or operator shall satisfy the reporting requirements in § 230.20 at this time.