yourstate.us
7 CFR 1724.1

§ 1724.1 Introduction.

United States · 7 CFR — Agriculture · Status: effective

Get this as JSONEmbed this
Cite this
Citation
7 CFR 1724.1, § 1724.1 Introduction, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/27159
Permanent ID
ys:prov:27159@1
SHA-256
d2390f85dc07b35076bee8f9813a21e8bc7ba2f92363d7bff3a50e797f8010e1

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) The policies, procedures and requirements in this part implement certain provisions of the standard form of loan documents between the Rural Utilities Service (RUS) and its electric borrowers. (b) All borrowers, regardless of the source of financing, shall comply with RUS' requirements with respect to design, construction standards, and the use of RUS accepted material on their electric systems. (c) Borrowers are required to use RUS contract forms only if the facilities are financed by RUS. Borrowers have three options: (1) Submit the actual contract used for review and approval; (2) Submit a certification that the required contract was used for the electric project or; (3) Submit a certification that the contract was not used but the essential and identical provisions specifically listed in the certification were used in the contract for constructing the electric facilities.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.