7 CFR 1724.40
§ 1724.40 General.
United States · 7 CFR — Agriculture · Status: effective
Cite this
- Citation
- 7 CFR 1724.40, § 1724.40 General, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/27180
- Permanent ID
ys:prov:27180@1- SHA-256
0c686c242d5cdfd9634e95c8991a37497f33e6a2e37539a75b7bebf1e7381492
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
Borrowers shall have ongoing, integrated planning to determine their short-term and long-term needs for plant additions, improvements, replacements, and retirements for their electric systems. The primary components of the planning system consist of long-range engineering plans and construction work plans. Long-range engineering plans identify plant investments required over a long-range period, 10 years or more. Construction work plans specify and document plant requirements for a shorter term, 2 to 4 years. Long-range engineering plans and construction work plans shall be in accordance with part 1710, subpart F, of this chapter. See also RUS Bulletins 1724D-101A, Electric System Long-Range Planning Guide, and 1724D-101B, System Planning Guide, Construction Work Plans, for additional guidance. These bulletins are available at https://www.rd.usda.gov/resources/regulations/bulletins.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.