7 CFR 1726.10
§ 1726.10 Introduction.
United States · 7 CFR — Agriculture · Status: effective
Cite this
- Citation
- 7 CFR 1726.10, § 1726.10 Introduction, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/27201
- Permanent ID
ys:prov:27201@1- SHA-256
0fec2d1ec08db16d98f5902190357f2752a952a97a551699f345061182760a12
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
The policies, procedures and requirements included in this part are intended to implement provisions of the standard form of loan documents between the Rural Utilities Service (RUS) and its electric borrowers. Unless prior written approval is received from RUS, borrowers are required to comply with RUS policies and procedures as a condition to RUS providing loans, loan guarantees, or reimbursement of general funds for the construction and improvement of electric facilities. Requirements relating to RUS approval of plans and specifications, duties and responsibilities of the engineer and architect, and engineering and architectural services contracts, are contained in other RUS regulations. The terms “RUS form”, “RUS standard form”, “RUS specification”, “and RUS bulletin” have the same meanings as the terms “REA form”, “REA standard form”, “REA specification”, “and REA bulletin”, respectively, unless otherwise noted.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.