yourstate.us
7 CFR 1726.12

§ 1726.12 Applicability.

United States · 7 CFR — Agriculture · Status: effective

Get this as JSONEmbed this
Cite this
Citation
7 CFR 1726.12, § 1726.12 Applicability, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/27203
Permanent ID
ys:prov:27203@1
SHA-256
2f8e2a5e27e6518aceb0b1cafb56a2065885a361aaf59ea67cf6d17f5b542930

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

The requirements of this part apply to the procurement of materials and equipment for use by electric borrowers in their electric systems and to the construction of their electric systems if such materials, equipment, and construction are financed, in whole or in part, with loans made or guaranteed by RUS, including reimbursable projects. In order for general fund expenditures for procurement or construction to be eligible for reimbursement from loan funds, the borrower must comply with the procedures required by this part. In the case of jointly owned projects, RUS will determine on a case by case basis the applicability of the requirements of this part.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.