§ 1726.18 Pre-loan contracting.

United States · 7 CFR — Agriculture · Status: effective

Get this as JSONEmbed this
Cite this
Citation
7 CFR 1726.18, § 1726.18 Pre-loan contracting, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/27209
Permanent ID
ys:prov:27209@1
SHA-256
b4a9e1addcd61896fef0a1d1e26986a0cf9fad6dd57b980a563361ee4cb3c15a

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

Borrowers must consult with RUS prior to entering into any contract for material, equipment, or construction if a construction work plan, general funds, loan or loan guarantee for the proposed work has not been approved. While the RUS staff will work with the borrower in such circumstances, nothing contained in this part is to be construed as authorizing borrowers to enter into any contract before the availability of funds has been ascertained by the borrower and all environmental review requirements in accordance with 7 CFR part 1970, have been met.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.