§ 1726.22 Methods of construction.

United States · 7 CFR — Agriculture · Status: effective

Get this as JSONEmbed this
Cite this
Citation
7 CFR 1726.22, § 1726.22 Methods of construction, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/27213
Permanent ID
ys:prov:27213@1
SHA-256
66138b1b9f0e9e39e3bfec6b8f98d9a037bd0d1981fed4f75cb215abfe596c1c

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

The borrower is generally responsible for determining whether construction will be by contract or force account. If construction is by contract, the borrower must determine whether materials will be supplied by the contractor or will be furnished by the borrower. RUS reserves the right to require contract construction in lieu of force account construction on a case by case basis.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.