§ 1753.3 Preconstruction review.

United States · 7 CFR — Agriculture · Status: effective

Get this as JSONEmbed this
Cite this
Citation
7 CFR 1753.3, § 1753.3 Preconstruction review, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/27692
Permanent ID
ys:prov:27692@1
SHA-256
f931b6855f5503aab0381a28434818bf4335bb69a31432ceeadf0dc4208388f8

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) Advance RUS approval must be obtained for any construction that does not conform to RUS standards and specifications or the approved LD, such as construction of extensions to serve subscribers in areas not included in the LD (See 7 CFR part 1737). For loans approved after RUS approval of the modernization plan in the borrower's state, the proposed construction must conform to the modernization plan, as required by 7 CFR part 1751, subpart B. To obtain approval, the borrower shall submit a written proposal containing: (1) A description of the work, indicating any deviations from the approved LD or RUS standards and specifications. (2) An engineering study covering the deviations if there are changes in the design. (3) A cost estimate for labor, engineering, materials, and overheads. (4) If applicable, a brief analysis from the borrower demonstrating that the proposed changes conform to the modernization plan. (b) Before any construction, including interim construction, is initiated, the GFR shall meet with the borrower to review the LD to determine if any significant changes have occurred since its approval by RUS. It is important that the design and construction of the proposed facilities be based on the latest information on subscriber needs. (c) If the borrower and GFR agree that there have been no significant changes, the borrower may proceed. (d) If the GFR finds that the LD is no longer satisfactory, the borrower shall prepare an amendment to the LD incorporating the necessary revisions (See 7 CFR part 1737). The borrower must obtain RUS approval of the LD amendment before proceeding with engineering activities on any project to be financed with loan funds.