7 CFR 1753.49

§ 1753.49 Closeout documents.

United States · 7 CFR — Agriculture · Status: effective

Get this as JSONEmbed this
Cite this
Citation
7 CFR 1753.49, § 1753.49 Closeout documents, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/27727
Permanent ID
ys:prov:27727@1
SHA-256
7c09fea9fa891314cbf144a620231549dc3f87bffd57f0edf7f0416fec77b6a8

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) General. The borrower shall be responsible for preparing the closeout documents with, if necessary, the assistance of the GFR. (b) Documents required. The following table lists the documents required to closeout the RUS contract Form 515. Documents Required To Closeout Construction Contract [RUS Form 515] (c) Closeout procedure. (1) After construction has been completed in accordance with the plans and specifications, and acceptance tests have been made, the borrower shall arrange the time for a final inspection to be made by the borrower's engineer, the contractor, the GFR and a representative of the borrower. (2) Final inventory documents. (i) The borrower shall obtain certifications from the engineer that the project and all required documentation are satisfactory and complete. Requirements for these contract closeout certifications are contained in § 1753.18. (ii) The borrower shall prepare and distribute the final inventory documents in accordance with the tables contained in this section. The documents listed for RUS shall be retained by the borrower for inspection by RUS for at least two years from the date of the engineer's contract closeout certification. Step-by-Step Procedure for Closeout of Construction Contract [RUS Form 515] (iii) When the total inventory price exceeds the maximum contract by more than 20 percent, an extension to the contractor's bond is required. (iv) The borrower shall submit the engineer's contract closeout certification with FRS for the final advance of funds. (3) Final payment shall be made according to the payment provisions of article III of RUS Form 515, except that certificates and other documents required to be submitted to or approved by the Administrator shall be submitted to and approved by the Owner.