9 CFR 590.124
§ 590.124 Schedule of operation of official plants.
United States · 9 CFR — Animals and Animal Products · Status: effective
Cite this
- Citation
- 9 CFR 590.124, § 590.124 Schedule of operation of official plants, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/35592
- Permanent ID
ys:prov:35592@1- SHA-256
5fc3f2e1a294d09413743c7739132c1f385d227ea169ac45cb81935b607716a9
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
Operating schedules for an official plant shall be subject to approval of the Administrator. The normal operating schedule shall consist of a continuous 8-hour period per day and shall include the time for FSIS inspection program personnel to put on required gear and to walk to a work station, and the time for FSIS inspection program personnel to return from a work station and remove required gear (excluding not to exceed 1 hour for lunch), 5 consecutive days per week, within the administrative workweek, Sunday through Saturday, for each full shift required. Clock hours of daily operations need not be specified in a schedule, although as a condition of continuance of approval of a schedule, the hours of operation must be reasonably uniform from day to day.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.