10 CFR 52.54
§ 52.54 Issuance of standard design certification.
United States · 10 CFR — Energy · Status: effective
Cite this
- Citation
- 10 CFR 52.54, § 52.54 Issuance of standard design certification, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/37480
- Permanent ID
ys:prov:37480@1- SHA-256
dc79b2127159f97f2ddfbb6b69c60c8d61c073e4207c01f9690d23ac08efa265
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) After conducting a rulemaking proceeding under § 52.51 on an application for a standard design certification and receiving the report to be submitted by the Advisory Committee on Reactor Safeguards under § 52.53, the Commission may issue a standard design certification in the form of a rule for the design which is the subject of the application, if the Commission determines that:
(1) The application meets the applicable standards and requirements of the Atomic Energy Act and the Commission's regulations;
(2) Notifications, if any, to other agencies or bodies have been duly made;
(3) There is reasonable assurance that the standard design conforms with the provisions of the Act, and the Commission's regulations;
(4) The applicant is technically qualified;
(5) The proposed inspections, tests, analyses, and acceptance criteria are necessary and sufficient, within the scope of the standard design, to provide reasonable assurance that, if the inspections, tests, and analyses are performed and the acceptance criteria met, the facility has been constructed and will be operated in accordance with the design certification, the provisions of the Act, and the Commission's regulations;
(6) Issuance of the standard design certification will not be inimical to the common defense and security or to the health and safety of the public;
(7) The findings required by subpart A of part 51 of this chapter have been made; and
(8) The applicant has implemented the quality assurance program described or referenced in the safety analysis report.
(b) The design certification rule must specify the site parameters, design characteristics, and any additional requirements and restrictions of the design certification rule.
(c) After the Commission has adopted a final design certification rule, the applicant shall not permit any individual to have access to, or any facility to possess, Restricted Data or classified National Security Information until the individual and/or facility has been approved for access under the provisions of 10 CFR parts 25 and/or 95, as applicable.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.