§ 53.1030 Annual adjustments to cost estimates for decommissioning.

United States · 10 CFR — Energy · Status: effective

Get this as JSONEmbed this
Cite this
Citation
10 CFR 53.1030, § 53.1030 Annual adjustments to cost estimates for decommissioning, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/37640
Permanent ID
ys:prov:37640@1
SHA-256
a4d546d83dd7ee9902a735a7e0f2225b403f6d6e698470cc72519e7a8fcae974

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

Each holder of an OL or COL under this part must annually adjust the cost estimate for decommissioning to account for escalation in labor, energy, and waste burial costs. Licensees may elect to use either a site-specific adjustment factor, approved as part of the plan and associated decommissioning report required by § 53.1010, in paragraph (a) of this section or the generic adjustment factor in paragraph (b) of this section. (a) A site-specific adjustment factor must address the estimated contributions and escalation of costs for the following aspects of decommissioning: (1) Labor, materials, and services; (2) Energy and waste transportation; and (3) Radioactive waste burial or other disposition. (b) A generic adjustment factor must be at least equal to 0.65 L + 0.13 E + 0.22 B, where L and E are escalation factors for labor and energy, respectively, and are to be taken from regional data of U.S. Department of Labor Bureau of Labor Statistics and B is an escalation factor for waste burial and is to be taken from NRC report NUREG-1307, “Report on Waste Burial Charges.”

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.