§ 53.1158 Issuance of early site permit.

United States · 10 CFR — Energy · Status: effective

Get this as JSONEmbed this
Cite this
Citation
10 CFR 53.1158, § 53.1158 Issuance of early site permit, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/37666
Permanent ID
ys:prov:37666@1
SHA-256
ec200fe9f12fcc52ff3406d55f7434e578a53d788ddfef8e6ec7e178b44a874b

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) The Commission may issue an early site permit, in the form the Commission deems appropriate, if the Commission finds that— (1) An application for an early site permit demonstrates compliance with the applicable standards and requirements of the Act and the Commission's regulations; (2) Notifications, if any, to other agencies or bodies have been duly made; (3) There is reasonable assurance that the site is in conformity with the provisions of the Act and the Commission's regulations; (4) The applicant is technically qualified to engage in any activities authorized; (5) The proposed ITAAC, including any on emergency planning, are necessary and sufficient, within the scope of the early site permit, to provide reasonable assurance that the facility has been constructed and will be operated in conformity with the license, the provisions of the Act, and the Commission's regulations; (6) Issuance of the permit will not be inimical to the common defense and security or to the health and safety of the public; (7) Any significant adverse environmental impact resulting from activities requested under § 53.1146(c) can be redressed; and (8) The findings required by 10 CFR part 51 have been made. (b) The early site permit must specify the site characteristics, design parameters, and terms and conditions of the early site permit the Commission deems appropriate. Before issuance of either a CP or COL referencing an early site permit, the Commission must find that any relevant terms and conditions of the early site permit have been met. Any terms or conditions of the early site permit that could not be met by the time of issuance of the CP or COL, must be set forth as terms or conditions of the CP or COL. (c) The early site permit must specify those § 53.1130(b) activities requested under § 53.1146(c) that the permit holder is authorized to perform.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.