10 CFR 53.1413
§ 53.1413 Contents of applications for combined licenses; general information.
United States · 10 CFR — Energy · Status: effective
Cite this
- Citation
- 10 CFR 53.1413, § 53.1413 Contents of applications for combined licenses; general information, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/37735
- Permanent ID
ys:prov:37735@1- SHA-256
6ed17bb3068cd6e0064cfaf01c1dfa2995e1b59cd81918403cd98122a23aa419
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
An application for a COL must include the information required by § 53.1109 and, except for an electric utility applicant in regard to financial assurance required after a Commission finding under § 53.1452, the application must include information sufficient to demonstrate to the Commission the financial qualification of the applicant to carry out, in accordance with the regulations in this chapter, the activities for which the permit or license is sought. As applicable, the following should be provided:
(a) The information that demonstrates that the applicant appears to be financially qualified to cover estimated construction costs and related fuel cycle costs, including estimates of the total construction costs and related fuel cycle costs of the facility, a financial capacity plan, and any source(s) of funds available at the time of application to cover these costs. If available funding at the time of application is 50 percent or less, the applicant should include proposed license conditions to facilitate verification that funding is available prior to the start of construction.
(b) The applicant must submit information that demonstrates the applicant appears to be financially qualified to cover estimated operation costs for the period of the license. The applicant must submit estimates for total annual operating costs for each of the first 5 years of operation of the facility, a financial capacity plan and indicate any source(s) of funds available at the time of application to cover these costs. If available funding at the time of application is 50 percent or less, the applicant should include proposed license conditions to facilitate verification that funding is available prior to the start of operations.