§ 60.3 License required.

United States · 10 CFR — Energy · Status: effective

Get this as JSONEmbed this
Cite this
Citation
10 CFR 60.3, § 60.3 License required, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/37864
Permanent ID
ys:prov:37864@1
SHA-256
1b02cbd96df27747feb582855a2c7a67dd8ac1737c7be5b2ea3870f5eb2c4316

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) DOE shall not receive or possess source, special nuclear, or byproduct material at a geologic repository operations area except as authorized by a license issued by the Commission pursuant to this part. (b) DOE shall not commence construction of a geologic repository operations area unless it has filed an application with the Commission and has obtained construction authorization as provided in this part. Failure to comply with this requirement shall be grounds for denial of a license.