§ 63.31 Construction authorization.

United States · 10 CFR — Energy · Status: effective

Get this as JSONEmbed this
Cite this
Citation
10 CFR 63.31, § 63.31 Construction authorization, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/38052
Permanent ID
ys:prov:38052@1
SHA-256
75859f9fecd013a30cfb16ed010e5d1b0968d8daf5a606257d188501d8be0a08

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

On review and consideration of an application and environmental impact statement submitted under this part, the Commission may authorize construction of a geologic repository operations area at the Yucca Mountain site if it determines: (a) Safety. (1) That there is reasonable assurance that the types and amounts of radioactive materials described in the application can be received and possessed in a geologic repository operations area of the design proposed without unreasonable risk to the health and safety of the public; and (2) That there is reasonable expectation that the materials can be disposed of without unreasonable risk to the health and safety of the public. (3) In arriving at these determinations, the Commission shall consider whether— (i) DOE has described the proposed geologic repository as specified at § 63.21; (ii) The site and design comply with the performance objectives and requirements contained in subpart E of this part; (iii) DOE's quality assurance program complies with the requirements of subpart G of this part; (iv) DOE's personnel training program complies with the criteria contained in subpart H of this part; (v) DOE's emergency plan complies with the criteria contained in subpart I of this part; and (vi) DOE's proposed operating procedures to protect health and to minimize danger to life or property are adequate. (b) Common defense and security. That there is reasonable assurance that the activities proposed in the application will not be inimical to the common defense and security. (c) Environmental. That, after weighing the environmental, economic, technical, and other benefits against environmental costs, and considering available alternatives, the action called for is the issuance of the construction authorization, with any appropriate conditions to protect environmental values.