yourstate.us
10 CFR 73.72

§ 73.72 Requirement for advance notice of shipment of formula quantities of strategic special nuclear material, special nuclear material of moderate strategic significance, or irradiated reactor fuel.

United States · 10 CFR — Energy · Status: effective

Get this as JSONEmbed this
Cite this
Citation
10 CFR 73.72, § 73.72 Requirement for advance notice of shipment of formula quantities of strategic special nuclear material, special nuclear material of moderate strategic significance, or irradiated reactor fuel, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/38454
Permanent ID
ys:prov:38454@1
SHA-256
3857cab4d5666f2d34b14f8941d5eb2624a856e23857e169f3b9243fcc29ba05

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) A licensee, other than one specified in paragraph (b) of this section, who, in a single shipment, plans to deliver to a carrier for transport, to take delivery at the point where a shipment is delivered to a carrier for transport, to import, to export, or to transport a formula quantity of strategic special nuclear material, special nuclear material of moderate strategic significance, or irradiated reactor fuel 1 required to be protected in accordance with § 73.37, shall: 1 For purposes of 10 CFR 73.72, the terms “irradiated reactor fuel” as described in 10 CFR 73.37 and “spent nuclear fuel” are used interchangeably. (1) Notify in writing by mail addressed to ATTN: Director, Office of Nuclear Security and Incident Response, U.S. Nuclear Regulatory Commission, Washington, DC 20555, or by using any appropriate method listed in § 73.4 of this part. Classified notifications shall be sent to the NRC headquarters classified mailing address listed in appendix A to this part. (2) Assure that the notification will be received at least 10 days before transport of the shipment commences at the shipping facility; (3) Include the following information in the notification: (i) The name(s), address(es), and telephone number(s) of the shipper, receiver, and carrier(s); (ii) A physical description of the shipment: (A) For a shipment other than irradiated fuel, the elements, isotopes, enrichment, and quantity; (B) For a shipment of irradiated fuel, the physical form, quantity, type of reactor, and original enrichment; (iii) A listing of the mode(s) of shipment, transfer point(s), and route(s) to be used; (iv) The estimated time and date that shipment will commence and that each country along the route is scheduled to be entered; and (v) The estimated time and date of arrival of the shipment at the destination; (4) The NRC Headquarters Operations Center shall be notified about the shipment status by telephone at the phone numbers listed in appendix A to this part. Classified and safeguards notifications shall be made by secure telephone. The notifications shall take place at the following intervals: (i) At least 2 days before commencement of the shipment; (ii) Two hours before commencement of the shipment; and (iii) Once the shipment is received at its destination. (5) The NRC Headquarters Operations Center shall be notified by telephone of schedule changes of more than 6 hours at the phone numbers listed in appendix A to this part. Classified and safeguards notifications shall be made by secure telephone. (b) A licensee who conducts an on-site transfer of spent nuclear fuel that does not travel upon or cross a public highway is exempt from the requirements of this section for that transfer.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.